1,How long will it take to produce an order?
It is at least 40 days for the purchasing and production time with container order
y 15 days for the sample.The reason why we take it long is purely guarantee the quality.
2, What is your minimum order?
Yes, usually 2000kgs for the seamless carbon steel tubes,
1000kgs for the low carbon bundy steel tubes,
100kgs or 50 kgs for the seamless capillary tubes.
If the sizes are in our regular production, the quantity can be at your request.
3. What form of quotation do you offer?
FOB Shanghai/China), CIF and CNF Your destination
4. What is your payment term?
Payment is 30% deposit, 70% before shipment for the container order.
100% T/T in advance for LCL order or the sample order. We accept US dollar,Euro,GBP.etc
5. Does the sample for free or not?
The samples are free if they are common sizes,You need to pay the freight charge.
6. How do you guarantee the quality of the products?
All of our procedures are strictly operated under the ISO 9001, there are as many as 9 times of checking during the production of each product to ensure the quality.we have our own test centres, Every tubes will be inspected and tested before package.
7. How do you to package the product?
Internal wrapped with plastic foil, external wrapped with polywoven bags for bundles
Plywood cases or wooden boxes for thin wall thickness tubes and LCL shipment is a must.
Other forms of packages can be achieved after discussion.
8. How are the orders shipped?
By sea or air. We arrange up to the port of departure or port of destination (Shipment/ freight to be paid by the buyer).
9.How about the Third Party Inspection ?
We have been working with DNV,TUV,SGS,BV,etc;since 2012.
If you have other questions,please contact us.
Tubos de precisión de aluminio & Tubería Tubos de precisión de latón & Tubería Tubos de precisión de cobre & Tubería Tubos de precisión de titanio & Tubería
EN10305-1/4 Seamless Tubes EN10305-2/3/5/6 Welded Tubes ISO8535-1 Tubos de inyección de combustible Tubos Bundy de pared simple/doble
Seamless Honed/SRB Pipes A210/A179 Boiler & Tubos de presión Extruded Fin Tubes & Tubería Control Line & Injection Stainless Tubes
Tubos capilares de acero inoxidable Tubos inoxidables sin costura & Tubería Tubos inoxidables soldados & Tubería Nickel Alloy Precision Tubes & Tubería
[/vc_column_text][/vc_column][/vc_row]
-
Tubo de carbono/inoxidable con forma
16 Productos -
Tubo de latón & Tuberías
17 Productos -
Bobina metálica / barra / hoja / tira
24 Productos -
Tubo inoxidable & Tuberías
12 Productos -
Tubo de titanio & Tuberías
8 Productos -
Tubo de aleta extruida/soldada
16 Productos -
Tubo de cobre & Tuberías
16 Productos -
Tubos de molibdeno & Tubería
2 Productos -
Tubos de niobio & Tubería
2 Productos -
Tungsteno & Aleaciones de tungsteno
2 Productos -
Tántalo & Aleaciones de tantalio
3 Productos -
Circonio & Tubos de aleación de circonio
3 Productos -
Tubo de precisión no ferroso
12 Productos -
Inyección & Tubos de línea de control
8 Productos -
Tubos de aleación de níquel & Tubería
11 Productos -
Tubos de aluminio & Tubería
17 Productos -
Tubos de titanio & Tubería
20 Productos -
Tubos de latón & Tubería
16 Productos -
Tubos capilares no ferrosos
12 Productos -
Tubos de cobre & Tubería
18 Productos -
Caldera & Tubos de acero a presión
12 Productos -
ISO8535-1 Tubo de inyección de combustible
4 Productos -
Tubos inoxidables sin costura & Tubería
21 Productos -
Low Carbon Bundy Steel Tube
18 Productos